CASE STUDY
MORE THAN 25 HILTI STORES
CASE STUDY
KNOW ALL ABOUT HILTI PROJECT
Hilti was one of the most challenging projects for our team, we design and manufactured each deployment off-site in our factory in Porto, and after that all the parts were shipped and assembled in each location. Assembling was approximately 4 to 6 days at the final site. This way of construction was very fast and cost efficient. Allowing the brand to expand in Spain in a very short term with a network of more than 25 locations in months.
- all
- Stores